FABRICATION, ERECTION, TESTING & COMMISSIONING

ESP

  • TANGEDCO We Successfully completed the project of Dismantling and Erection work in ESP Internals in MTPS- I (210MW X 4) from 2017 to 2018.
  •  TANGEDCO, we successfully completed the project of Dismantling and Erection work in GD Screen Plate in MTPS
  • TANGEDCO, we successfully completed the project of DUCT Repair work in MTPS- I (210MW X 4) from 2017 to 2018.
  • KOTHARI SUGARS & CHAMICAL LIMITED, We have successfully completed the project for Renovation, Erection, Testing & Commissioning of  collecting & emitting electrodes, emitting bottom frame, shock bar angles, shock bar guide angle & guide plate, entire CERM & EERM rapping mechanism in UNIT- 01-  I & II Pass
  • DHANALAKSHMI SRINIVASAN  SUGARS PVT LTD , We have successfully completed the project for Renovation, Erection, Testing & Commissioning of  collecting & emitting electrodes, emitting bottom frame, shock bar angles, shock bar guide angle & guide plate, entire CERM & EERM rapping mechanism in UNIT- 01-  I, II, III Pass.
  • SAINT GOBAIN, We have successfully completed the project for Renovation, Erection, and Testing & Commissioning of collecting & emitting electrodes.

  • DHANALAKSHMI SRINIVASAN SUGARS PVT LTD, We have successfully completed our Mechanical scope of works involving dismantling of existing ESP components to the extent required, Erection, Testing & Commissioning for revamping of ESP a work completed in a short span of 10 days on July 2021.

  • DHANALAKSHMI SRINIVASAN SUGARS PVT LTD, We have successfully completed the project for Renovation, Erection, Testing & Commissioning of  Outer& Inner Casing Plate in UNIT- 01-  I, II, III Pass.

CONVEYOR

  • BANNARI AMMAN SUGARS- UNIT- 04, Dismantling, Fabrication& Erection work of Bottom& Top Plates, Refixing of Racks, Rails in Slat Chain Conveyor& in Bagasse Elevator work in a short span of 14 days on SEPTEMBER 2022.

  • DHANALAKSHMI SRINIVASAN SUGARS PVT LTD, Replacement of Damaged repair work of idler roller, Structural repair work, pulley Replacement& Conveyor Belt Erection for over 400 Mtrs in a short span of 12 days on August 2022

  • DHANALAKSHMI SRINIVASAN SUGARS PVT LTD, we have successfully completed the work of Dismantling and Overhauling of Runner Flat in Cane Carrier, Bagasse Elevator& Slot Chain Conveyor work in a short span of 10 days on August 2022.

COMPRESSOR HOUSE & PIPELINE WORKS

  • TANGEDCO, we have successfully completed the work of Overhauling and Maintenance in Compressor House in MTPS- II of (600 MW) in 2016 to 2020.

  • VELLORE CO- OP SUGAR MILLS, UNIT- 01, We successfully completed the work of Dismantling, Fabrication,  Erection& Overhauling of  PAN VAPOUR LINE 1 TO 6 and PAN EVAPORATOR BODY & SS SUCTION  DELIVERY LINE.

Many desktop publishing packages and web page editors now use Lorem Ipsum as their default model text, and a search for ‘lorem ipsum’ will uncover many web sites still in their infancy. Various versions have evolved over the years, sometimes by accident, sometimes on purpose here are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form, by injected humour, or randomised words which don’t look even slightly believable.

Ready to Talk?

Our intention is to provide value addition to the clients through innovative technologies and skills developed in each discipline that are applicable to any client location.

Call now